Section 16.56.050 Manufactured home park regulations--Construction drawings--Requirements.

    A.    Three (3) copies of detailed construction drawings shall be supplied to and approved by the Vernal City Public Works Department and City Engineer prior to approval by the Planning Commission.
    B.    Such construction drawings shall be drawn by a licensed engineer and shall show the following:
    1.    Profile and location of water and sewer lines;
    2.    Location of water vales and fire hydrants;
    3.    Location and size of water meters;
    4.    Location and size of sewer manholes;
    5.    Storm water disposal plan. (PZSC § 03-27-001 (3))
(Ord. No. 98-16, Amended, 10/21/98; Ord. No. 98-16, Amended, 10/21/98)